+ journal

1810, 2017

Proscenium is Hiring!

October 18th, 2017|Architecture, All, Employment, Design|

                We are currently looking for a junior and two intermediate Architectural Graduates, Graduate Technologists or Interior Designers with at least 2 to 3 years of postgraduate experience. This individual must be confident enough to take on projects, develop a work plan and work well both independently and as part of a team. Confidence in decision making and

1610, 2017

2017 IDIBC Shine Award for BMO Theatre

October 16th, 2017|All, Awards, Company News, Design|

AWARD OF EXCELLENCE - PUBLIC & INSTITUTIONAL - BMO THEATRE CENTRE Proscenium Interiors is honoured to have won the Award of Excellence for BMO Theatre. Congratulations Kerri! Lead Designer: Kerri Shinkewski, RID Proscenium Architecture + Interiors Inc. Photography: Andrew Latreille The interior design concept for the BMO Theatre Centre used material and pattern to weld spaces of disparate programme into a cohesive theatrical experience, creating

2108, 2017

Metal Construction News article: Rheinzink

August 21st, 2017|Architecture, Design, All|

Renovating a Historic Cathedral Marcy Marro, Editor, Posted 07/03/2017 RHEINZINK protects and preserves heritage of 120-year-old church Built in 1894, Christ Church Cathedral was the first church in Vancouver, British Columbia, Canada. Over the past  22 years, the church underwent a major four-phase renovation, which concluded with the total replacement of its roof. The church's original roof was cedar shake, and over the years, various additions and modifications were undertaken,

1207, 2017

Pipe Shop Completed

July 12th, 2017|All, Design, Architecture, Uncategorized|

We are excited to present our freshly completed renovation of the Pipe Shop Venue at the Shipyards, in North Vancouver. Accessible washrooms, a servery, a projector surface, and fresh paint were added to the 1940’s Pipefitter’s Building – a 9,050 square foot community hall at the base of Lonsdale Avenue. Check out the full project description in our WORK section!     Photography by Sam

1207, 2017

Energia Prize: Letter of Congratulations

July 12th, 2017|All, Awards, Company News, Design, Architecture|

Following the Energia Prize we received last May, we’ve received a congratulation letter from the Minister of “Développement Durable, Environnement et Lutte contre les changements climatique" of the province of Quebec. We thought we’d share the letter:   Gentlemen,  I would like to address my most sincere congratulations on winning the “AQME Prize” during the 2017 Energia Contest organized by l’Association québécoise pour la maitrise

606, 2017

The 27th Energia Contest recognizes Pageau Morel!

June 6th, 2017|Architecture, Design, Awards, All|

The 27th Energia Contest recognizes excellence in Quebecois achievements and celebrates local genius in matters of energy efficiency in categories related to building, technological innovations, industrial processes and manufacturing, transportation, integrated design and greenhouse gas emissions reduction. Pageau Morel was recognized as the electrical and mechanical engineering firm on the design team of MEC’s Head Office, which was designed using an integrated design process involving

1805, 2017

Pipe Shop Venue Renovation – North Vancouver

May 18th, 2017|Architecture, Design, All|

We are thrilled to see the community embrace our recently completed renovation of The Pipe Shop Venue at the Shipyards, in North Vancouver. Since opening on April 8th, The Pipe Shop has hosted weddings, yoga classes, galas, dinners, pop-up markets, night markets, early learning initiatives, photo shoots, and private events. The Pipe Shop, built in the 1940’s and previously known as the Pipefitter's Building, was

1811, 2016

Canadian Architect article on climate change

November 18th, 2016|Architecture, Design, All|

"Proscenium Architecture + Interiors designed Mountain Equipment Co-op’s Vancouver headquarters to underscore the company’s sustainability agenda, using daylighting and advanced air control systems that allow it to be 70 percent more energy efficient than a conventional office building." -Canadian Architect Magazine Photo by Ed White Photographics https://www.canadianarchitect.com/features/the-heat-is-on/

2208, 2016

Christ Church Cathedral Bell-Spire

August 22nd, 2016|Architecture, Design, All|

A crowning feature of the current project is the addition of the highly anticipated bell-spire at the north-east corner of the Cathedral,  set atop the existing elevator core. This open glass and steel structure housing four electronically controlled and custom cast bronze bells will be one of the last Architectural additions to this project. This weekend was an exciting milestone, as the bells were lifted

808, 2016

Christ Church Cathedral Bell Tower

August 8th, 2016|Architecture, Design, All|

  On Friday July 8th, 2016, crews lifted into place the two halves of the new Christ Church Cathedral Bell Tower. The tower was constructed and painted offsite to take advantage of the precision assembly and coating possible in a controlled shop environment. It was constructed in two halves because the transmission of gravity loads generated by lifting the entire tower would have blown in the

1808, 2015

Langara’s Science and Technology Building’s Steel Structure

August 18th, 2015|Architecture, Design, All, Company News|

The Langara Science and Technology continues to make good progress. Below you can find some of the work that has been done on the steel structure. Photos by Latreille Architectural Photography Photo by Latreille Architectural Photography   Photo by Latreille Architectural Photography Photo by Latreille Architectural Photography Photo by Latreille Architectural Photography Photo by Latreille Architectural

2811, 2014

Artist Selected for Christ Church Bell Spire

November 28th, 2014|Uncategorized, Architecture, Design, All|

Proscenium has been working with Christ Church Cathedral on restoring their heritage cathedral over the last decade.  The current phase of work sees the restoration of the roof along with the construction of a 1oo foot tall bell spire clad in stained glass.  The bell spire is one step closer to reality with the selection of Canadian artist, Sarah Hall and her stained glass design,

611, 2014

Patagonia’s Vancouver Flagship Coming Soon

November 6th, 2014|All, Company News, Design, Architecture, Uncategorized|

Proscenium is hard at work with Patagonia on their new Vancouver store, the first in city and only the second in Canada. The West 4th flagship location in Kitsilano is targeted to open at the end of November just in time for the Christmas shopping season. This adaptive re-use project retains much of the existing building, salvaging as much material as possible for the new store.

1712, 2013

Guest Blogger: Jeff Bohnen, MEC

December 17th, 2013|All, Company News, Design, Architecture, Uncategorized|

We are so excited to have Jeff Bohnen, Office Services Manager at MEC back as a guest blogger.  Please read on for some insight into the process of bringing the new MEC head office to life. After years of continued expansion, MEC has simply outgrown our existing Head Office space. Creative solutions to increase our capacity – increasing density by removing separation panels to create open,

212, 2013

Office Field Trip

December 2nd, 2013|All, Company News, Design, Architecture|

It was a rainy Friday when the office trekked out to see our latest completed project; 17,000 square feet of office space for Austeville Properties in Vancouver.  As the Final touches were being completed we had the opportunity to tour the space, appreciate the workmanship and a job well done.    

3110, 2013

Duet

October 31st, 2013|Design, All|

Proscenium had the good fortune to work once again with Chard Development on their new residential project in Victoria.  Now under construction, the Duet is 90 condos nestled in the prime Victoria neighbourhood of James Bay.  You can read more about our design process with Chard Development on the Duet Blog.

Go to Top