+ journal

2510, 2023

BCIT SW1 Renewal Study

October 25th, 2023|

Proscenium worked with BCIT (British Columbia Institute of Technology) in 2022-23 to develop a Feasibility Study for the comprehensive renewal of the SW1 Building at the Burnaby campus. The Study envisions the seamless integration of four wings of the 1962 building, home to over ten academic and administrative departments, and includes structural, seismic, architectural and functional programmatic

1611, 2022

UBC MacLeod Renewal

November 16th, 2022|

The MacLeod Building Renewal comprehensively refreshed UBC's Electrical and Computer Engineering building for a new generation of study. The extensive renovation project, a collaboration between Proscenium and Teeple Architects, carried out a sensitive architectural retrofit of a 1967 building designed by the celebrated Vancouver firm Thompson Berwick & Pratt. This project renovated the building down to its

1306, 2017

Langara College Science & Technology Building

June 13th, 2017|

Recipient of a Lieutenant Governor Award of Merit and a SABMag Canadian Green Building Award, the Science & Technology Building at Langara College was conceived of as a gateway to the Langara Campus. The 157,000 ft², LEED Gold, six-level building includes science labs, administrative and student social spaces. The project was a collaboration between Proscenium and Teeple

1307, 2017

Pipe Shop Venue at the Shipyards

July 13th, 2017|

Proscenium worked with the City of North Vancouver to renovate the Pipe Shop Venue at the Shipyards into an adaptable and desirable community event space. On a tight budget and schedule, our team sought to bring out the best in the 1940’s Pipefitter’s Building by using white paint to focus attention on the heavy timber structure. Locating

Go to Top